The Cross-Section
What the mountain is made of.
Seven services, laid down in layers. Open any one to see the timeline, what's included, and how we actually work through it.
Build — Making new ground.
Promotional website design & dev The face the world sees first. We design and build it, still warm from the source.
- Timeline
- 4–8 weeks
- Included
- Design system and page templates
- Responsive build, hand-written not templated
- CMS wiring so you can edit copy without us
- Performance and accessibility pass before launch
- How it goes
- We start with the pages that carry the most weight — usually the homepage and one service page — and get those right before touching the rest. Everything after that is filling a system in, not inventing one page at a time.
Logo & visual identity design A mark that survives the heat — identity systems built to hold their shape at any scale.
- Timeline
- 3–5 weeks
- Included
- Wordmark or logo with responsive variants
- Type, colour and spacing system
- Usage guidelines
- Exported asset set for print and screen
- How it goes
- Three directions, honestly different from each other rather than three shades of the same idea. You pick one, we refine it. We do not present work we would be unhappy to see chosen.
MVP definition & delivery The first hard crust of a product. Scoped tight, shipped fast, solid enough to stand on.
- Timeline
- 8–14 weeks
- Included
- Scoping down to a single core loop
- Working product, deployed, not a prototype
- Auth, data and hosting set up properly
- Handover with the code and the reasoning
- How it goes
- The hard part is deciding what not to build. We spend the first week arguing scope down, because everything cut in week one is time you get back in week ten.
Platform architecture design & build Bedrock for everything after. Architecture that carries the weight you haven't added yet.
- Timeline
- 10 weeks+
- Included
- Data model and tenancy design
- Infrastructure as code
- CI, environments and migration tooling
- Documentation your next developer can follow
- How it goes
- We design for the load you can credibly see coming, not the load that would flatter the architecture diagram. Over-building early is as expensive as under-building.
Sustain — Keeping it solid.
Website redesign & audit Resurface what's cracked. We audit the fault lines, then rebuild along them.
- Timeline
- 2 weeks audit, then scoped
- Included
- Performance, accessibility and SEO audit
- Findings ranked by impact, not by ease
- Rebuild scoped from what the audit found
- Redirect map so existing rankings survive
- How it goes
- The audit comes first and stands alone — if it turns out you need three fixes rather than a redesign, we will tell you that, even though it is the smaller job.
Ecommerce integration Open trade routes across the new terrain — carts, payments, inventory, wired in cleanly.
- Timeline
- 4–10 weeks
- Included
- Cart, checkout and payment provider setup
- Stock sync with your existing systems
- Order and fulfilment flow
- Tax and shipping configuration
- How it goes
- We work around the systems you already run rather than replacing them. The till that runs your shop is not a thing to rip out mid-trade.
Maintenance, support & hosting We watch the seams so you don't. Monitoring, patches, and hosting that just holds.
- Timeline
- Ongoing, monthly
- Included
- Managed hosting and backups
- Dependency and security patching
- Uptime and error monitoring
- A defined response window for when something breaks
- How it goes
- You get told when something broke and what we did about it, including the times you would never have noticed. Silence is not the same as nothing happening.
No prices listed, deliberately — the work varies too much for a number to mean anything before we've talked. Ask for a quote and you'll get a real one.