The Cross-Section

What the mountain is made of.

Seven services, laid down in layers. Open any one to see the timeline, what's included, and how we actually work through it.

Build — Making new ground.

Promotional website design & dev The face the world sees first. We design and build it, still warm from the source.
Timeline
4–8 weeks
Included
  • Design system and page templates
  • Responsive build, hand-written not templated
  • CMS wiring so you can edit copy without us
  • Performance and accessibility pass before launch
How it goes
We start with the pages that carry the most weight — usually the homepage and one service page — and get those right before touching the rest. Everything after that is filling a system in, not inventing one page at a time.
Get a quote
Logo & visual identity design A mark that survives the heat — identity systems built to hold their shape at any scale.
Timeline
3–5 weeks
Included
  • Wordmark or logo with responsive variants
  • Type, colour and spacing system
  • Usage guidelines
  • Exported asset set for print and screen
How it goes
Three directions, honestly different from each other rather than three shades of the same idea. You pick one, we refine it. We do not present work we would be unhappy to see chosen.
Get a quote
MVP definition & delivery The first hard crust of a product. Scoped tight, shipped fast, solid enough to stand on.
Timeline
8–14 weeks
Included
  • Scoping down to a single core loop
  • Working product, deployed, not a prototype
  • Auth, data and hosting set up properly
  • Handover with the code and the reasoning
How it goes
The hard part is deciding what not to build. We spend the first week arguing scope down, because everything cut in week one is time you get back in week ten.
Get a quote
Platform architecture design & build Bedrock for everything after. Architecture that carries the weight you haven't added yet.
Timeline
10 weeks+
Included
  • Data model and tenancy design
  • Infrastructure as code
  • CI, environments and migration tooling
  • Documentation your next developer can follow
How it goes
We design for the load you can credibly see coming, not the load that would flatter the architecture diagram. Over-building early is as expensive as under-building.
Get a quote

Sustain — Keeping it solid.

Website redesign & audit Resurface what's cracked. We audit the fault lines, then rebuild along them.
Timeline
2 weeks audit, then scoped
Included
  • Performance, accessibility and SEO audit
  • Findings ranked by impact, not by ease
  • Rebuild scoped from what the audit found
  • Redirect map so existing rankings survive
How it goes
The audit comes first and stands alone — if it turns out you need three fixes rather than a redesign, we will tell you that, even though it is the smaller job.
Get a quote
Ecommerce integration Open trade routes across the new terrain — carts, payments, inventory, wired in cleanly.
Timeline
4–10 weeks
Included
  • Cart, checkout and payment provider setup
  • Stock sync with your existing systems
  • Order and fulfilment flow
  • Tax and shipping configuration
How it goes
We work around the systems you already run rather than replacing them. The till that runs your shop is not a thing to rip out mid-trade.
Get a quote
Maintenance, support & hosting We watch the seams so you don't. Monitoring, patches, and hosting that just holds.
Timeline
Ongoing, monthly
Included
  • Managed hosting and backups
  • Dependency and security patching
  • Uptime and error monitoring
  • A defined response window for when something breaks
How it goes
You get told when something broke and what we did about it, including the times you would never have noticed. Silence is not the same as nothing happening.
Get a quote

No prices listed, deliberately — the work varies too much for a number to mean anything before we've talked. Ask for a quote and you'll get a real one.